All honest feedback is posted - good or bad. Hard copies of the current details are available upon request as noted above from the Public Works Construction and Engineering Office, 520 SE 155th Ave., and at the city's Community Economic Development department, 415 W. Sixth Street. Do your own research using online ratings, reviews and through phone interviews before hiring a company. Also refer to Sign Requirements for Building Review. Specify all design load values, including dead, live, snow, wind, lateral retaining wall pressuresand soil bearing values. 2023 Sewer Engineering Show the location and size of beams, posts, and interior footings and their dimensions and connections to the foundation. Show the design of ramps, landings, and handrails. endobj Provide those items that are applicable to your project. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map, Education Resources for Students and Teachers, Emergency Water Supply Distribution Master Plan, Factoria Boulevard Stormwater Conveyance Improvements Project, Kelsey Creek Culvert at Lake Hill Project, Lake Washington Lake Line Management Plan Project, Newport Sewer Basin Improvements Projects, Somerset Reservoir Decommissioning Project. We share an interest in spreading awareness of investment trusts as an option for self-directed investors and financial advisers. Show the height of the sign measured from the ground level of the sign location to the highest point of the sign. Show that both the trees and shrubs together will cover a minimum of 25 percent of the required planting area. Show a layout and detailing of the anchoring or bracing system, showing cables, rods, tie- downs, or dead men. Provide a typical foundation section. If you have any questions, please visit or call WebTransportation Standard Details are provided for the purpose of construction standards and requirements for City of Vancouver projects. Specify all structural materials and connections. Specify structural observation if required for the project. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map, 2019 Surface Water Engineering Standard Details, EXISTING ROLLED CURB FRAME & GRATE INSTALLATION, CONVERSION RISER FOR CATCH BASIN TYPE 1-L, COMBINED VAULT (DETENTION AND RUNOFF TREATMENT), BIORETENTION OVERFLOW WITH CONVEYANCE FURROW, PERVIOUS ASPHALT OR CONCRETE PAVEMENT SECTION, PERMEABLE PAVEMENT SIDEWALK IN PLANTING STRIP, OBSERVATION PORT COVERS FOR PERMEABLE PAVEMENT, GRATE FOR EXISTING ROLLED CURB INSTALLATION. Lets find you the best HomeAdvisor screened and approved professionals. whenever concerns are brought to our attention. WebCity of Bellevue Submittal Requirements STANDARDS FOR PLANS AND DRAWINGS The Bellevue standards for plans and drawings are necessary for clarity, for readability, and for permanent storage. Your rating will help other customers make the smart choice when hiring. 2023 Details; City of Bellevue, WA. Specify reinforcement footing size, minimum embedment and reinforcement. Each development within a BelRed land use district must comply with the provisions of the BelRed Subarea Design Guidelines contained in this section. Please submit comments City of Vancouver, Department of Public Works, PO BOX 1995, Vancouver WA 98668-1995. DIY Project? Learn more See our website for sample projects. WebAll civil plans shall be prepared by a professional engineer, licensed in Washington State, with relevant roadway, street lighting and traffic signals design experience. WebUtilities Projects, Plans and Standards; Utilities Codes and Standards; Surface Water Engineering Standards; 2019 Surface Water Engineering Standard Details; City of Provide a street light level analysis using AGi32 software to determine optimal street light locations that meet the citys standards. Specify connections. Shepherds Hood Detail for Type O and Type P Street Lighting Standards, Vandal Resistant Bollard (Lighted and Non-Lighted), Typical Connecting Public Street with Pathways and Lighting, Street Light Contactor Service Wiring Diagram, Typical Interconnect Conduit and Cable Installation, DISCONTINUED: Fiber Optic Terminal Cabinet Detail, Interconnect Junction Box to Splice Box Detail, DISCONTINUED: Fiber Optic Splice Enclosure and Cable Management, DISCONTINUED: Communication Cabinet Detail, Lighted Crosswalk Enclosure Electrical Cabinet Detail, Lighted Crosswalk Enclosure Wiring Diagram, Rapid Rectangular Flashing Beacon Assembly Detail, Rapid Rectangular Flashing Beacon Foundation Detail, Rapid Rectangular Flashing Beacon Service Cabinet Detail, Rectangular Rapid Flashing Beacon Assembly With Solar Mounted Power Source, School Flasher Standard Detail Construction Notes and Indicator Light Detail, School Flasher Standard Details Control Cabinet Detail, School Flasher Standard Detail Wiring Diagram, School Flasher Standard Detail Optional Installation on Existing Light Pole and Service Connections, Street Name Sign Placement at "T" Intersections, Street Name Sign Placement at 4-way Intersections, Street Name Sign Placement at Angled and Curved Intersections, Street Name Sign Placement at "Special Condition" Intersections, Pavement With Transition Signs and Markings, Typical Signing for School Area Traffic Control with Raised Crosswalk, Typical Signing for School Area Traffic Control, Stop Sign, Stop Bar and Crosswalk Locations Details, Triangle Speed Bump Legend and Bump Legend at Raised Crosswalk, On-Street Parallel Parking Stall Markings, On-Street and Parking Facility Angle Parking Stall Marking, Thru-Right and Thru-Left Turn Arrow Markings. Draw all proposed signs (to scale); note the size and type. The format of the details is intended to allow individual details to be added, deleted or superseded. Provide details for all unusual, project specific conditions. | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map. Introduction. Your plan reviewer will provide information on more specific requirements. Show the largest faade area of the building or tenant space. If you have concerns that a pro in our network doesn't meet these standards, please. We represent our clients and prepare landscape designs and construction drawings that are used for competitive bidding to multiple contractors. WebThe 2023 Construction Standard Specifications and Standard Plans apply whenever any public or private construction is performed in the City of Seattles Right of Way. Utilities' engineering standards are updated annually. ;7gH;[FV#4.AqL~ Ex@a|4`l5uJ"a`BM9. Please note that as of September 1, 2021, multiple details have been updated. If a business states that it's registered as a corporation or limited liability company, we confirm that the company is in good standing in the state in which they operate. Show foundation layout, and specify all dimensions. WebCity of Bellevue Submittal Requirements 1 STANDARDS FOR PLANS AND DRAWINGS Sets of Plans-- Submit the sheets un-stapled and grouped with the like Show all connection details, including post-beam, post-footing, wall-footing, wall-ceiling, wall-roof, collar ties, strong backs, etc. We use a third-party vendor to conduct a criminal records search in the state in which the business owner or principal works. Please try again shortly. Please be aware that the reporting in the NCD is particularly limited in the following states: AL, CO, DE, GA, ID, IL, KS, LA, ME, MA, MI, MS, MT, NE, NV, NH, NM, SD, UT, VA, VT, and WY. Show an elevation of all existing and proposed signs; note materials, color and finishes. Please be advised that, during this period, if we could not perform a background check, HomeAdvisor will allow the business into the network and match the business to consumers. WebSurface Water Engineering Standards The city provides current and previous surface water engineering standards, including detail drawings and a summary of the updates to the International Building Code. Suspended ceilings shall be seismically braced by an engineered design or CISCA guidelines. WebUtilities Projects, Plans and Standards; Utilities Codes and Standards; Surface Water Engineering Standards; 2022 Details; 2022 Details. Show setbacks to the sign from driveways and front and side property lines. Once a business is rated, we require it to maintain an overall average of two stars or greater. Provide connection details of the lateral resisting elements to show continuous load path from roof to foundation. Nearby homes similar to 1417 NW Winters Creek Rd have recently sold between $350K to $3M at an average of $305 per square foot. Homeowners connected with the Service Pros through HomeAdvisor can rate their businesses. While designing public improvements the City encourages exceeding the minimum criteria WebAn architectural set of drawings consists of the following elements as they apply to your project. Partial cross section showing the foundation, structural members (studs, beam, post, wall) and fastening method (bolts, screws, lags, nails, welds). We perform this screening when a business applies to join our network and, if the business is accepted, Your building plan reviewer will provide information on more specific requirements. Where Puget Sound Energy (PSE) owns or will own the street lighting system (generally on local streets), a PSE construction drawing (for their own crews installation) must be submitted to the city by PSE at the developers request and expense. WebHomeAdvisor verifies the social security number (s) of the owner/principal for identity check purposes. Utilities engineering standards are updated annually. Specify pressure-treated wood and hot-dip galvanized or stainless steel fasteners, anchors and hardware where required. -. Development Services - Transportation Design Manual Drawings | Cit Web20.25D.150, Design Guidelines. Include detailed voltage drop calculations along with illumination calculations and luminary photometrics. Located at the south shore of Lake Washington, the Airport has a land-based and sea-based airstrip. We require all users - pros and homeowners - to uphold our core values as outlined in our. Surface Water Engineering Standards. WebRenton Municipal Airport is owned and managed by the City of, and is a general aviation airport serving Renton and other nearby communities. Vancouver Public Works crew and equipment are ready, Severe Weather Response - Deicing Streets, Preventing and Handling Frozen Water Pipe, Improving our Street System - Needs and Strategies, Traveling Vancouver Streets - Self-guided Streets Trip, Broadway Corridor Utility and Paving Project to start mid-February 2022, Vancouver prepares for busy 2021 season of paving and preserving streets, NE 18th Street West - Public Outreach and Information, SE Mill Plain Boulevard Improvement Project, Public invited to NE 137th Avenue Open House on Wednesday, Dec.3, Lane Closures Planned for SE 1st Street Project Starting January 2022, NE 137th/138th Avenue Improvement Project, Fourth Plain Area - Sidewalk Project along Rossiter and Neals Lanes, Q&A - Vancouver LED Street Light Conversion, Street Funding Strategies Input & Outreach, City of Vancouver Construction Projects - Weekly Update, Vancouver recognizes Mac Award Winner Urban Youth Program during monthlong tree celebration, International Day of Forests Trivia Night, VOLUNTEER Friends of Trees Northeast Vancouver Planting, Caring for trees now protects against future damage, Tree Canopy Achievement Program - TreeCAP, Tree Care Companies with Street Tree Worker License, Guide to Invasive Trees in the City of Vancouver, Urban Forestry Seeks to Make a Difference With Annual Yard Tree Giveaway, Silva Bolds-Whitfield Award Monument Plaza, Silva Bolds-Whitfield Urban Forestry Award, Stormwater, Surface Water & Groundwater Utility, Controlling Development and Construction Runoff, Surface Water/Stormwater Design & Construction Requirements, Reading in the Wild Story Time with Nature, Fantastic Facility - About the Water Center, Sewer System & Wastewater Treatment Facilities, Sewer Connection Incentive Program (SCIP), Sewer Connection Incentive Program Projects, Partnering with Clark Regional Wastewater District, Trenchless Service Lateral Repair Information, Water, Sewer and Surface Water Capital Improvement Program, General Requirement Standards & Details for Water, Sanitary Sewer & Stormwater, Transportation Improvement Program Comments & Suggestions, Transportation Development Review Information, Tree Requirements for Development Projects, Sewer improvement project to impact East 6th Street downtown, Spring coupons offer free disposal of yard debris, tires, Vancouver prepares for busy season of paving and preserving streets, Single Family Residence Driveway With Wings and No Curb, Sidewalk Replacement Minimum Criteria to Ensure ADA Compliance, Single Directional Curb Ramp Attached Sidewalk, Single Directional Curb Ramp Detached Sidewalk, Standard Landing Cross Sections A-A and B-B, DISCONTINUED: Paver Landing Cross Sections A-A and B-B, Standard Landing Cross Sections C-C and D-D, DISCONTINUED: Paver Landing Cross Sections C-C and D-D, Ramp Lip Detail and Detectable Warning Pattern, Pedestrian Refuge Island Intersection with Nose, Typical Pedestrian Refuge Island Sections, Construction Notes for Irrigation within Right of Way ONLY, Automatic Control Valve with UNIK Control Module, DISCONTINUED: Double Check Valve Assembly (DCVA), DISCONTINUED: Tree Planting Perforated Pipe Installation, DISCONTINUED: Deciduous Balled/Burlap Tree Planting, Shrub Container Planting, Perennial and Ground Cover Details, 4' x 8' Tree Grate Frame Preferred Option, Tree Grate Frame for Paver Sidewalk Areas, Intersection Cross Slopes and Crown Run-Off, Arterial Streets Residential/Commercial Driveway Widths, Standard Trench Restoration Notes (Sheet 1 of 2), Standard Trench Restoration Notes (Sheet 2 of 2), Standard Trench Restoration - HMA Granular Backfill, Standard Trench Restoration - HMA Control Density Fill, Standard Trench Restoration - HMA - Transverse Cuts, Standard Trench Restoration Portland Cement Concrete Pavement, Steel Layout for Concrete Patch - Interior, Steel Layout for Concrete Patch - Exterior, Curb and Gutter Restoration at Driveways with Detached Sidewalk, Optional E-1 Curb Replacement with A-1 Curb and Gutter, Test Hole (Pothole/Test Hole/Monitoring Well) Section and Plan View, Fourth Plain Boulevard "Village" Sidewalk, Fourth Plain Boulevard "Village" Corner Without Bus Stop, Fourth Plain Boulevard "Village" Corner With Bus Stop, Fourth Plain Boulevard "Green Necklace" Sidewalk North Side, Fourth Plain Boulevard "Green Necklace" Sidewalk South Side, Fourth Plain Boulevard "Commercial" Street Sidewalk, Fourth Plain Boulevard Paver at Tree Well and Planter Strip, Fourth Plain Boulevard Pedestrian Access at Unsignalized Locations, Vandal Resistant Bollard (lighted and non-lighted), Typical Connecting Public Street with Pathway and Lighting, Chain Link Fence Blow-up Details Types 3 and 4, Chain Link Gate Blow-up Details Types 3 and 4, Street Termination for Personal Vehicles (not Emergency Vehicles), Local Access and Loop Road Half Street Construction, 6-Lane Principal Arterial with Center Left-Turn and Bike Lanes, 6-Lane Principal Arterial with Center Left-Turn Lane, 4-Lane Principal Arterial with Center Left-Turn Lane and Bike Lanes, 4-Lane Principal Arterial with Center Left-Turn Lane, 4-Lane Minor Arterial with Center Left-Turn and Bike Lane, Fort Vancouver Way - Campus Street Standard (McLoughlin to Fourth Plain), 4-Lane Minor Arterial with Center Left-Turn Lane, 3-Lane Collector/Minor Arterial with Bike Lanes, Neighborhood Circulator Non Residential Local Access, Local Access Option A (32' Roadway Width), Local Access Option B (28' Roadway Width), Traffic Control Detail - One-Lane, Two-Way Traffic Control with Flaggers, Traffic Control Detail - Pilot Car Operation, Traffic Control Detail - Single-Lane Closure for Multi-Lane Roadways, Traffic Control Detail - Double- Lane Closure for Multi-Lane Roadways, Traffic Control Detail - Shoulder Closure - Low Speed (40 MPH OR Less), Traffic Control Detail - Shoulder Closure High Speed, Traffic Control Detail - Temporary Off-Ramp for Multi-Lane Roadways, Traffic Control Detail - Temporary On-Ramp for Multi-Lane Roadways, Traffic Control Detail - Right Lane Closure with Shift - 5 Lane Roadways, Traffic Control Detail - Left Lane and Center Turn Lane - 5 Lane Roadways, Traffic Control Detail - Lane Shift - 3 Lane Roadways, Traffic Control Detail - Short Term Ramp Closures, Traffic Control Detail - Intersection Lane Closure - 3 Lane Roadways, Traffic Control Detail - Intersection Lane Closure - 5 Lane Roadways, Traffic Control Detail - Intersection Pedestrian Traffic Control, Traffic Control Detail - Mid-Block Pedestrian Traffic Control, Traffic Control Detail - Single Lane Closure with Shift, Traffic Control Detail - Typical Roundabout Flagging Operation, Traffic Control Detail - Intersection Lane Closure - 2 Lane Roadways, Traffic Control Detail - Temporary Pedestrian Ramp with Edge Board, Traffic Control Detail - Temporary Pedestrian Platform with Edge Board, Mast Arm Configurations for Type II and Type III Traffic Signal Standards, Pole Configurations for Type II, Type III, Type B and Type S Traffic Signal Standards, Recessed Terminal Compartment Detail for Type II, Type III, Type B and Type S Traffic Signal Standards, Type I, Type I-D and Type I-DT Traffic Signal Standards, Type PS and Type PPB Traffic Signal Standards, Double Diagonal Ramp Placement for Traffic Signal Standard, Double Directional Ramp Placement for Traffic Signal Standards, Double Parallel Ramp Placement for Traffic Signal Standards, Overhead Street Name Sign Mounting and Fabrication Details, DISCONTINUED: "H" Mount ADA Pedestrian Push Button Assembly, DISCONTINUED: Audible Pedestrian Signal Detail, DISCONTINUED: Push Button Marking Options for Pedestrian Warning Lights, Pre-emption Indicator Light Details and Pre-emption Detector Mounting Details, Mounting Bracket Assembly with Tenon Clamp, Type II and III Traffic Signal Pole Foundation Detail, Type I, Type I D, Type I DT, Type PS, Type PPB Traffic Signal Pole Foundation Detail, Loop Numbering, Loop Detector Configuration and Saw Cut Details, Input Terminal for "P" Cabinet Detection Panel Assembly, Input Terminal for "MSX" Cabinet Detection Panel Assembly, Video Camera Mounting on Mast Arm Details, Video Camera Mounting on Safety Light Details, Fisheye Video Camera Mounting on Mast Arm Details, DISCONTINUED: Typical Single Door Cabinet Pad Installation Details, Typical Front and Back Door Cabinet Pad Installation Details, DISCONTINUED: Typical Single Door "P" Cabinet Details, Typical Front and Back Door "P" Cabinet Details, Traffic Signal Service with Battery Backup Electrical Cabinet Detail, Traffic Signal Service with Battery Backup Wiring Diagram, Type "P" Cabinet Interior Layout (Left Side), Type "P" Cabinet Interior Layout (Right Side), Type "P" Detection Assignments for Card Cage, Type "MSX" Cabinet Interior Layout (Back), Type "MSX" Cabinet Interior Layout (Door), Type "MSX" Cabinet Interior Layout (Left Side), Type "MSX" Cabinet Interior Layout (Right Side), Type "MSX" Detection Assignments for Card Cage, "COV 44 D" for 2070N, NEMA X3, and XN-2 "D" Connector and PIN Assignments, 9800ATC T2 "D" Connector and PIN Assignments, Type "M" HAWK Signal Cabinet Interior Layout (Back), Type "M" HAWK Signal Cabinet Interior Layout (Door), Type "M" HAWK Signal Cabinet Interior Layout (Left Side), Type "M" HAWK Signal Cabinet Interior Layout (Right Side), Type "M" HAWK Signal Detection Assignments for Card Cage, Polara APS Navigator Interconnect Board and Wiring Harness, City Street Lighting Requirements Schedule Luminance Method (Straight Sections), City Street Lighting Requirements Schedule Illuminance Method (Curved Sections), City Street Lighting Requirements Intersection Illuminance, Type A and Type AT Arterial Lighting Standards, DISCONTINUED: Type A and Type AT Residential Lighting Standards, DISCONTINUED: Painting Details for Type D and Type DT Light Standards, Direct Burial for Street Lighting Standards, Cast-in-Place Foundation for Street Lighting. What is the screening process that Service Professionals go through in order to become members of the HomeAdvisor network? Shoreline Master Program. By clicking Confirm Appointment, you affirm you have read and agree to the HomeAdvisor Terms & Conditions, and you agree and authorize HomeAdvisor and its affiliates, and their networks of Service Professionals, to deliver marketing calls or texts using automated technology to the number you provided above regarding your project and other home services offers. All required landscaping must be installed within 60 days of completion of the sign installation unless the code administrator grants an extension in writing for reasons of weather, good planting practices, or unforeseeable construction delay. These plans also evaluate our management of these systems, provide direction for future planning, and help us meet federal, state and regional regulations. Suggestions and comments are welcomed. If required, the plan is typically done early in the design review or preliminary plat/short plat process. To find more licensing information for your state, visit our HomeAdvisor verifies state-level licensing where applicable - note: If the landscaping will not be installed concurrently with the sign, the applicant must provide a Performance Assurance Device in accordance with Land Use Code 20.40.490. Electronic copies of the details are available in Adobe Acrobat (PDF format). Find hiring guides, material costs, expert advice, how-to's and more. Specify all design loads. Take steps to avoid asbestos danger, Reducing, Reusing and Recycling Plastic Bags and Wrap, Garbage & Recycling Services for Your Business, Archives, Resources & Historical References, What Will Winter Bring? Public Works Administration | ADA/Title VI Notices | Terms of Use | Privacy Policy | Site Map, State Construction Stormwater General Permit. Also include all relevant features on this plan sheet, including but not limited to above and below ground utilities, building awnings/overhangs, street trees, crosswalks, driveways, etc. Show typical building sections. Include the height of any unbalanced retained soil. Destination. Web2022 Water Engineering Standards Individual Details. 3 0 obj<>/ExtGState<>/XObject<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI]>>/Annots[15 0 R 386 0 R 393 0 R 396 0 R 403 0 R 406 0 R 413 0 R 416 0 R 423 0 R]/MediaBox[0 0 612 792]/Contents 4 0 R/Group<>/StructParents 0>> A Highly motivated Rigging/Lifting Engineer,(LOLER Appointed Person, ECITB,OPITO and LEEA certified) Technical Professional with a Graduated Construction Engineering University background, with distinguished experience planning Rigging and Lifting, onstruction projects from inception to completion on time and budget. 2019City of Bellevue | All Rights Reserved. Show the largest faade of the tenant space and note its area in square feet. 2019City of Bellevue | All Rights Reserved. The owner or principal of each business in HomeAdvisor's network (with the exception of Corporate Accounts) must pass a background check. Structural design is required for free-standing storage racks more than eight feet tall. ), wind, seismic, snow, equivalent fluid pressure, soil bearing values and geotechnical engineering parameters. We are licensed and professional landscape architects. WebStructural Plans Requirements A Structural drawings set includes the following components as they apply to your project. A Structural drawings set includes the following components as they apply to your project. All Utilities capital projects valued at $100,000 or more can be found on the city's capital projects map. Please Sewer, surface water, and water codes, engineering standards, maps and comprehensive plans. Engineered Foundation: Stamped engineered plans with calculations are required for all projecst except for single family residential structures or townhomes designed in accordance with the Residential Building Code. Utilities engineering standards are updated annually. Fax: 360-487-7139. PSE must apply for all required permits prior to beginning work and will install the equipment. Refer to the Transportation Design Manual and Street Lighting Design Guide (Appendix A). Check out these tips from MattZurcher, Sr. VP of Customer Care. Indicate the distance between any intermediate rails. Specify metal connectors, including joist hangers, clips, post caps, post bases, etc. All structural components of the sign itself (size included). Show structural connection details, including: Partial cross section showing foundation, structural members (studs, beam, post, wall), and fastening method (bolts, screws, lags, nails, welds). You may login with either your assigned username or your e-mail address. The first step in most landscape design projects is to collaborate with the individual homeowner/property owner to come up with an overall conceptual plan (or "master plan") of the property. Engineering plans for private development projects that affect streets shall include all applicable Transportation Standard Details. A preliminary street lighting plan may be required at the discretion of the Transportation Department for any project with public street frontage. 4500 SE Columbia Way Show the proposed sign, including dimensions, copy, color(s), materials, building faade and dimensions for the sign, and other information to illustrate the proposal (i.e., photo). 2023 Water Engineering b$?? Specify all welding to be done by WABO-certified welders. This plan must clearly state pole locations, pole type and height, luminaire arm type and length, luminaire type, and wattage. *The comprehensiveness of the NCD varies by state. WebThe Periscope Art & Architecture Educational Institute existed as a 501(c)(3) project platform activating a nexus of art, architecture, and urbanism for higher learning. Identity Verification (Reverse Phone Lookup) We conduct a reverse business phone lookup to identify records matching the phone number information provided by the business. Show how access by disabled persons will be provided (where required). For preparation information, see Standards for Plans and Drawings. 20.25D.150 Design Guidelines. endobj The best date ideas in Boston with free events, outdoor events, restaurant, concerts, museums, and sports. 1 0 obj<>/Metadata 375 0 R/ViewerPreferences 376 0 R/AcroForm 379 0 R>> W-2: Vertical Blocking with Restrained Joints for New Lines, W-3: Vertical Blocking for Connecting to Existing Main, W-5: Pipe Clamp and Anchor Rods for Concrete Blocking, W-8: Typical A.C. Water Main Crossing Replacement Detail, W-14: Fire Hydrant Guard Post & Valve Marker Post, W-19: Pressure Reducing Station Access Ladder and Pressure Relief Drain, W-20: Individual Pressure Reducing Valve Assembly (Residential), W-21: Individual Pressure Reducing Valve Assembly (Multi-Family or Commercial), W-22: Individual Pressure Reducing Valve Assembly with Pressure Relief (Multi-Family or Commercial), W-23: 1" X 1" Water Service (Horizontal Meter Setter), W-24: 1" X 1" Water Service (Vertical Mater Setter), W-25: 1 Domestic Water and/or Fire Service, W-26: 1 Domestic Water Service (Commercial and Multi-Family), W-28: 1 Irrigation Water Service (Commercial and Multi-Family), W-29: 2" Domestic Water and/or Fire Service, W-30: 2" Domestic Water Service (Commercial and Multi-Family), W-32: 2" Irrigation or Fire Sprinkler Water Service (Commercial and Multi-Family), W-33b: 3" Domestic Meter Materials List and Vault Requirements, W-33c: 4 Domestic Water Meter Installation, W-33d: 4 Domestic Meter Materials List and Vault Requirements, W-33f: 6 Domestic Meter Materials List and Vault Requirements, W-34b: 8 Domestic Meter Materials List and Vault Requirements, W-35: 3" to 6" Irrigation Meter Installation, W-36:1" to 2" Double Check Valve Assembly for Irrigation System (Outside Installation), W-38:Double Check Valve Assembly (Inside Installation), W-39:Outside DCVA Installation for 1 to 2" Commercial Fire Sprinkler Systems, W-40:Outside DCVA Installation for 3" or Larger Commercial Fire Sprinkler Systems, W-41:1 TO 2 Domestic Double Check Valve Assembly For Continuous Supply (Outside Installation), W-42:3 TO 6 Domestic Double Check Valve Assembly For Continuous Supply (Outside Installation), W-43:8" and 10" Domestic Double Check Valve Assembly for Continuous Supply (Outside Installation), W-44:3" to 10" Double Check Valve Assembly for Domestic and Irrigation Services (Outside Installation), W-45:3" to 10" Double Check Detector Assembly for Fire Sprinkler Systems (Outside Installation), W-46a:Reduced Pressure Backflow Assembly for Domestic and Irrigation Service (Outside Installation), W-46b:3" to 10" Reduced Pressure Backflow Assembly for Domestic and Irrigation Service (Buried Vault Installation), W-47:3" to 10" Reduced Pressure Detector Assembly for Fire Sprinkler Systems (Outside Installation), W-48:Reduced Pressure Backflow Assembly (Inside Installation), W-50:Requirements for FDC and Check Valve Routed Through Backflow Assembly Vault - 2, W-54:Roadway Clearances for Above Ground Appurtenances, 2019City of Bellevue | All Rights Reserved.
Falmouth Town Station Car Park, Cowbuyer Upcoming Auctions Near Manchester, Gloria Thomas Obituary, Dr Robert Bierenbaum Daughter, Articles C
city of bellevue standards for plans and drawings 2023